Yaqeen Digital Solutions

Yaqeen ERP

Food quality and lot hold

Checks on receipt and after production, critical control points, and holding a lot until it cures or passes.

Specifications and checks

Each product or category has a specification with tests: a measure with limits (Brix, moisture, net weight) or pass or fail (metal detector). A check is created for each lot received or produced that a specification covers, and it passes only when every test is within limits.

  • A received lot cannot leave the quality location for stock until its check passes.
  • A lot that failed a check is never delivered.
  • A quality certificate PDF for each check, in the user's language.

Critical control points

Readings such as cooking temperature and cooling time, with limits per point and line. A reading outside them needs the corrective action written down, and the CCP log prints as a PDF.

Recording these readings is not a certification of HACCP compliance.

Holding a lot

  • A product can put its finished lots on hold when production ends, for a number of hours (curing time), such as chewing gum or cooled candy.
  • Any lot can be held by hand with a reason, released, or rejected.
  • A held or rejected lot cannot be delivered: validating the delivery stops and names the lots.
  • Releasing before the hold ends needs the stock manager and a written reason, and who released it, when and why is kept on the lot.

Updated:

Did not find what you need?

Message us on WhatsApp, and the people who built it will answer.

Chat on WhatsApp